Furnace Rebuild 2004--Day 3

More demolition. We had the hoist built to haul bricks out of the basement and to send new bricks down. This was also the day we started drilling the floor out with the jack hammer. We needed to get down about 2 feet to start the rebuilding.


12 Pot Skeleton

Barrel Removal

Barrel Removal

Barrel Removal

Tube Removal

Furnace Eye

Recuperating Tubes Half Gone

Recuperating Tunnel

Furnace Floor & Eye